Komatsu — OPERATION OF SWITCHES

. ATTACHMENTS, OPTIONS HANDLING PAYLOAD METER HM PERFORMING CALIBRATION WHEN PERFORMING CALIBRATION PREPARATIONS BEFORE PERFORMING CALIBRATION 6 - 20 NOTICE Perform calibration in th e following cases. When the machine is delivered, a nd at each change of seaso When the suspension cylinder ga s pressure and oil ha s bee n adjuste d (When t he suspensio n has bee n adjusted.

When the machine ha s been modified a nd th e unloade d weight o f the machine has changed more than 100 kg (22 1 lb) When the suspension pressure s ensor has been replaced When any other chan ge has been made around t he When there is a difference b etwee n the condition of the machine r ecognized by the payload m eter and t he actual c ondition of the d ump truck. For d etails , see Sectio n "DISPLAY DURING NORMAL OPERATIONS (PAGE 6 -13)". Che ck that the len gth of the s uspensio n is within the prop er range. Fo r details, se e Section "CHECK LENGTH OF SUSPENSION CYLINDE R (PAGE 4-32)" Whe n performing c alibration, use a flat , straight r oad with no uneven p laces. (Distance : approx.

120 m (393 ft 8 in) Perform the check s with the machine u nloaded. Be s ure to completel y remove all the s oil r emaining inside the dum p body