OPERATION 6. Set the throttle from 1,500 to 1,600 RPM. 7. Position the machine as shown in the illustration above. Lower the bucket (1) to the ground. Continue lowering until the front wheels (2) come off the ground 5 cm (2 in.). Be sure both outriggers (3) are firmly on the ground. 8. Be sure your work area and boom swing radius is clear of all obstacles. Before starting your operations, sound the horn, and be sure all personnel are at least 20 m (40 ft) away from you and your work area. 9. When you are ready to start your excavation operations, sound the horn. ADJUSTING THE DIGGING BUCKET Depending upon the type of excavating operations, the digging bucket can be adjusted two ways. Pos. 1:
Normal digging operations ensures more breakout power to the bucket. Pos. 2: Suitable for operations on vertical walls, ensures the maximum movement and digging height on walls. In this position, the breakout force is reduced. WB140PS-2N WB150PS-2N 2-51