OPERATION DIGGING METHODS Because the machine is capable of excavating the surface underneath the outriggers, the machine can fall into the trench. CORRECT The bucket works best with its flat surface or cutting edge tipped down slightly but parallel to the ground. Begin retracting the arm while raising the boom simultaneously. Take care not to lift the machine when per- forming this part of the operation. Keep the bucket leading edge parallel with the surface being excavated. At the end of the stroke or when the bucket is full, curl the bucket. Keeping it level with the ground. Raise the boom and lift the arm and bucket out of the excavated site.
Once the boom is clear, swing it to the right or to the left, depending on the deposit point. Lower the boom and dump the full bucket, extending or retracting the arm if needed. INCORRECT The bucket is pushed down, reducing the breakout force. The bucket fills too quickly. INCORRECT The bucket is pushed upward, lifting the machine. The bucket does not fill completely. 2-52 WB140PS-2N WB150PS-2N