GROUP 5 GEAR BOX 1. REMOVAL AND INSTALL 1. REMOVAL AND INSTALL 1) 1) REMOVAL REMOVAL (1) Swing the work equipment 90 and lower it completely to the ground. (2) Operate the control levers and pedals several times to release the remaining pressure in the hydraulic piping. (3) Loosen the breather slowly to release the pressure inside the hydraulic tank. Escaping fluid under pressure can Escaping fluid under pressure can penetrate the skin causing serious injury. penetrate the skin causing serious injury. When pipes and hoses are disconnected, the oil inside the piping will flow out, so catch it in oil pan. 4 (4) Remove the propeller shaft mounting nuts (3). · Tightening torque :
7.4 ± 1.5 kgf · m 1 Propeller shaft 2 Travel motor (53.5 ± 10.8 lbf · ft ) 2 (5) Remove the travel motor mounting bolts (2). · Tightening torque : 14.7 ± 2.2 kgf · m (53.5 ± 10.8 lbf · ft ) Propeller shaft 3 Remove the hoses (4). Fit blind plugs to the disconnected hoses. (6) 2 (7) Remove the mounting bolts (2), then remove the gear box (1) device assembly. · Weight : 63 kg (140 lb ) · Tightening torque : 19.6 ± 2.9 kgf · m (142 ± 21 lbf · ft ) 2) 2) INSTALL INSTALL (1) Carry out installation in the reverse order to removal. (2) ① ② Bleed the air from the gear box. Remove the air vent plug. Pour in hydraulic oil until it overflows from the port. Tighten plug lightly.
Start the engine, run at low idling, and check oil come out from plug. Tighten plug fully. ③ ④ ⑤ (3) Confirm the hydraulic oil level and check the hydraulic oil leak or not. 7-52