hyundai R60WVS Pro — 10. BOOM, ARM AND BUCKET CYLINDER

3) 3) DISASSEMBLY DISASSEMBLY (1) (1) Remove cylinder head and piston rod Remove cylinder head and piston rod Hold the clevis section of the tube in a vise. Use mouth pieces so as not to damage the machined surface of the cylinder tube. Do not make use of the outside piping as a locking means. ① ② mm (7.1 in). Because the rod assembly is rather heavy, finish extending it with air pressure after the oil draining operation. Pull out rod assembly (3) about 200 200mm 3 ③ Remove rod cover (5) by hook spanner. Cover the extracted rod assembly (3) with rag to prevent it from being accidentally damaged during operation.

Turn counter clockwise Hook spanner 5 Cover here with rag ④ Draw out cylinder head and rod assembly (3) together from tube assembly (1). Since the rod assembly is heavy in this case, lift the tip of the rod assembly (3) with a crane or some means and draw it out. However, when rod assembly (3) has been drawn out to approximately two thirds of its length, lift it in its center to draw it completely. 1 Lift Full straight sideways 3 Oil pan 7-269