Komatsu — RADIATOR GROUP

REMOVAL AND INSTALLATION RADIATOR INSTALLATION OF THE RADIATOR GROUP To install, reverse removal procedure. 1 1 - Fill up the hydraulic oil to maximum level. Hydraulic oil: approx. 27 2 - Fill up the coolant liquid circuit to maximum level. Coolant liquid: approx. 9 3 - Start the engine to circulate the oil and the coolant, and check that there are no leaks. 4 - Stop the engine, check the levels and, if necessary, top them up. 2 Screws: 190 Nm 5 - Pressurise the tank and bleed the air from all circuits. (For details, see «20. TESTING AND ADJUSTMEN- TS»). 30-20 SK714-5 SK815-5