REMOVAL AND INSTALLATION RADIATOR REMOVAL OF THE RADIATOR GROUP Completelyraisetheworkingequipmentandtiltthecab. (For details, see «TILTING THE CAB»). 1 # Drain the hydraulic oil. 1 3 Hydraulic oil: max. 39 # Drain the coolant liquid: 2 Coolant liquid: max. 9 1 - Disconnect the hose (2) from the pump (1). 2 - Disconnect the coolant liquid drainage pipe (3) from the radiator. RKSA0460 3 - Disconnect the cable (4) of the hydraulic-oil clogging- sensor filter. 4 - Loosen the clamp (5) and disconnect the coolant liquid delivery pipe (6).
4 5 5 - Disconnect the coolant liquid return pipe (7) 6 7 RKSA0470 6 - Attach the radiator group (8) to some hoisting tackle and apply a slight tension to the cables. 10 Radiator-oil cooler group: .62 kg 8 7 - Loosen the screws (9), raise the radiator group (8) until the lower supports can be released, and move it a little way away from the frame. 2 8 - Disconnect the reversing siren connector (10). 9 9 RKSA0480 9 - Disconnect the pipes (11) and (12) and remove the complete group (8). 11 12 RKSA0490 30-19 SK714-5 SK815-5