c. If the measured pre-lift value deviates from the specified limit, replace the pin (14, 16), lift piece (13), spacer (15), and nozzle assembly (A) with a new “nozzle service kit”. Inspection of secondary opening pressure a. After confirming the pre-lift, operate the nozzle tester and increase the internal pressure up to 350 ~ 450 kgf/cm 2 to fully lift the needle valve. b. Release the nozzle tester handle to decrease the tester pressure, then take a note of the movements of the dial gauge. c. Take the indicated value on the pressure gauge at the point of time when the nee- dle of the dial gauge indicates the speci- fied needle valve lift value. (In general, pre-lift “ “ + 0.05mm.
Refer to following figure.) 90 0 10 200 300 80 20 100 400 70 30 60 50 40 0 500 EQM4056I - 114 - 14 13 15 16 A EQM4053I L lift of +0.05 Amount 0 Primary opening Secondary 350~450 pressure opening pressure kgf/cm2 EQM4054I 60 40 0 80 20 0 100 EQM4055I