. OPERATION MACHINE OPERATIONS AND CONTROLS OPERATION MACHINE OPERATIONS AND CONTROLS REMARK 3 - 78 adding the (3) then loosen radiato r cap ( 4) slowl y. After checking that the pressure has be en rel eased, push in pushe then loosen it furth er and remove Check that th e level of the c oolant is above the hatched portion in the diagram on th e right. If the w ater level i low, add water throug h the w ater fill er port. After a dding water, i nstall ra diator c ap (4). When operating in cold COLD OPERATION (PAGE 3-149