. LOADING SHOVEL MAINTENANCE EVERY 10 HOURS MAINTENANCE 7 - 24 LUBRICAT TING 1. Set to t he greasing po sture below, lower the work eq uipment to the ground, t hen stop the engine 2. Using a grease pump, pump in grease through the g rease fittings shown by a 3.
After g reasing, wipe of f any old grease that was pus (1) Boo m cylinder foot pin (2 places) ling pin (2 place) places) der rod end pin (2 places) der foot pin (2 places) t pin end - Link coupling pin (4 places) ubricating block (10 places) n end pin end pin ng pin (Boom side) nd pin (1 place) ling pin (Arm side) (2 places) (2) Arm - Bucket coup (3) Buc ket hinge pin (2 (4) Bot tom dump cylin (5) Bot tom dump cylin (6) Buc ket cylinder foo (7) Buc ket cylinder rod end - Link coupling pin (4 pla (8) Boo m centralized l Boo m foot pin Arm cylinder foot pi Boo m cylinder rod Buc ket cylinder rod Boo m - Arm coupli (9) Arm cylinder rod e (10) Bo om - Arm coup