POWER TRAIN - TRANSMISSION Mechanical 16. Install the cover with shims, seals and bearing cup, and tighten nuts (1) . Install two bolts (2) . Torque the M12 nuts to 80 - 90 Nm (59 - 66 lb ft ) . 3332a 16 17. Install a dial gauge (1) on the gearbox housing and locate the probe perpendicular against the side of the gear (1) . Apply a load in one direction and oscillate the shaft several times while the load is applied. Set the dial gauge to zero. Apply the load in the opposite direction, oscillate and read the axial movement of the shaft. Make three measurements at 120 degrees of the intermediate shaft. The average of the three readings, should be 0 - 0.03 mm ( 0 - .001 in ).
If required, adjust the shims. To decrease the axial movement, decrease the number of shims. NOTE: Be sure to measure on gear (1) as the other gears are mounted on needle bearings. 3439a 17 Next operation: Fork and shift rail - Install (C.20.B.56 - F.10.A.15) 9680 1 27/05/2004 C.20.B / 48