CROP PROCESSING - CLEANING Primary cleaning 12. When the fan is (1) assembled and adjusted properly it can be installed back into the machine 10041926A5 12 Next operation: Fan - Install (K.62.B.52 - F.10.A.15) 9717 1 27/05/2004 K.62.B / 40
CROP PROCESSING - CLEANING Primary cleaning 12. When the fan is (1) assembled and adjusted properly it can be installed back into the machine 10041926A5 12 Next operation: Fan - Install (K.62.B.52 - F.10.A.15) 9717 1 27/05/2004 K.62.B / 40