CROP PROCESSING - UNLOADING Grain unloading 8. With the cover installed onto the shaft attach the valve now if it was removed. If the valve was removed be sure to install new o ring seals and lube them with oil or petroleum jelly. 20035867 8 9. Torque the valve bolts (1) to 51 - 58 Nm ( 38 - 43 lb ft ) . 10036389C5 9 10. With the plate installed, torque the bolts (1) to 89 - 100 Nm ( 66 - 74 lb ft ) 20035859B5 10 9723 1 27/05/2004 K.72.B / 17