CROP PROCESSING - UNLOADING Grain unloading 11. Install the hydraulic lines to the valve. 50040394 11 12. Install the electrical connectors (1) to the valve, and any place else if they were removed for access. 10036391A5 12 13. Install the key into the shaft. 14. Use Loctite Brand 767 anti-sieze on the shaft before installing the pulley. Install the pulley (5) onto the shaft with the washer (4) and bolt (3) . Torque the M12 bolt (3) to 98 Nm ( 72 lb ft ) . 10036392A5 13 15. Install the belt (2) on the pulley (5) , and tighten the belt until the correct tension is met on the spring gauge (1) . 9723 1 27/05/2004 K.72.B / 18