CROP PROCESSING - UNLOADING Grain unloading ZDA3535A 2 2. To assemble the output shaft, proceed as follows: Install retaining ring (10) , original shim packs (11) , and outer race of bearing (8) . Install inner race of bearing (8) on bevel gear (7) . Apply a bluing compound to the gear teeth of the bevel gear and install bevel gear (7) with bearing in the gearbox housing. Install inner race of bearing (6) on output shaft (3) , and assemble the shaft in the gearbox housing. Install inner race of bearing (6) and shims (1) . Install cover (2) and tighten Allen screws (5) to torque of 25 - 32 Nm ( 19 - 24 lb ft ).
In order to set the two bearings (6) and (8) , hit the shaft on both ends, and rotate the shaft two full revolutions to seat the bearing rollers. Check the preload on the bearings with a torque meter. This preload should cause a rolling torque of 0.4 - 0.8 Nm ( 3 - 7 lb in ). Re-set shimming (1) if preload is not between the tolerance range shown. 9723 1 27/05/2004 K.72.B / 30 1. Shims 4. Seal 7. Bevel Gear 10. Retaining Ring 2. Cover 5. Allen Screw 8. Bearing 11. Shims 3. Shaft 6. Bearing 9. Seal