CROP PROCESSING - UNLOADING Grain unloading ZDA3507A 3 3. To pre-assemble the input shaft, first install the inner race of bearing (6) on input shaft (1) , pushing on the inner race only. Install the outer race of bearing (6) and spacer (5) . Install bearing (4) . Install shims (3) and retaining ring (2) . Hold up the assembly and hit the input shaft on both ends in order to set bearings (4) and (6) and rotate the bearing two full revolutions to seat the bearing rollers. Check the preload on the bearings with a torque meter. This preload should cause a rolling torque of 0.8 - 1.2 Nm ( 7 - 11 lb in ). Adjust shimming (3) if preload is out of the range shown. Install blade (7) and bolt (8) .
NOTE: Apply some thread locking compound to the bolt threads to prevent loosening. Tighten bolt (8) to a torque of 15 Nm ( 11 lb ft ). 9723 1 27/05/2004 K.72.B / 31 1. Input shaft 3. Shims 5. Spacer 7. Blade 2. Retaining ring 4. Bearing 6. Bearing 8. Bolt