CROP PROCESSING - UNLOADING Grain unloading ZDA3534A 4 4. To assemble the pre-assembled shaft (1) in the gearbox, proceed as follows: Install original inner shim pack (4) in the housing. Apply a bluing compound to the gear teeth of the input shaft, and install the pre-assembled input shaft partially into the gearbox housing, by pushing only on the outer race of the bearing. Check if the preload of the input shaft is still within the tolerance range shown. If so, push the shaft completely into the housing until tight against the inner shims (4) at the shoulder. Install outer shims (4) and spacer (3) .
Install retaining ring (2) , checking and adjusting shims so that there is no clearance between the retaining ring and spacer, (3) . While holding the output shaft to apply a light load to it, rotate the input shaft counter-clockwise several revolutions, as viewed from the end of the shaft. This will seat the bearing rollers, and will also mark the gear contact pattern in the bluing compound on the gear teeth. Check the gear backlash. The backlash should be between 0.12 - 0.32 mm ( 0.005 - 0.013 in ). 9723 1 27/05/2004 K.72.B / 32 1. Pre-assembled input shaft 3. Spacer 2. Retaining ring 4. Shims