CROP PROCESSING - UNLOADING Grain unloading Drive system Unload gearbox - Install (K.72.B.40.45 - F.10.A.15) AFX8010 1. Open cover (1) to check if the vertical auger is connected to the unloading tube gearbox connector sprocket. Turn auger so that bottom auger edge is resting on plate at the side of the housing to retain auger in housing. ZDA3084A 1 2. Install the unloading gearbox and chain shield (2) in place. Apply thread-locking sealant to bolt threads and retain gearbox with six bolts (1) and torque to 82 - 106 Nm ( 60 - 80 lb ft ). Install unloading drive chain (2) and adjust with nut (3) . NOTE: The gearbox weight is about 40 kg (88 lbs.). Use appropriate lifting equipment.
Use a minimum of two persons for this task. 10030016B5 2 3. Check gearbox oil level at plug (3) . Oil should be at, but not above, this plug. ZDA7874A 3 9723 1 27/05/2004 K.72.B / 36