CROP PROCESSING - UNLOADING Grain unloading 13. Install oil seal (1) in the cover. Apply sealing compound and install cover (2) . Install retaining ring (3) on the shaft. NOTE: Apply some grease on the shaft and the seal before installation. 20041769 12 14. Install sprocket (3) . Install washer (2) and bolt (1) . Torque to 82 - 106 Nm ( 60 - 78 lb ft ). NOTE: Apply some thread locking compound to the female threads in the shaft to prevent the bolt from loosening. ZDA3489A 13 15. Fill the gearbox with 0.6 L ( 20 oz ) of CASE AKCELA 135H EP GEAR LUBE SAE 80W-90 . NOTE: As this gearbox is not mounted horizontally, check the oil level after assembly on the combine.
Refer to Drive system Unload gearbox - Install (K.72.B.40.45 - F.10.A.15) . 9723 1 27/05/2004 K.72.B / 35