Case IH AFX8010 — LIGHTING SYSTEM

DISTRIBUTION SYSTEMS - LIGHTING SYSTEM Side work light - Overview (A.40.A.18 - C.10.A.10) AFX8010 The side work lights illuminate the left and right sides of the combine for better visibility in low light conditions. The side work lights can be activated in three different ways: DOOR - The side lights will be activated whenever the key switch is OFF and the left side door is opened or closed. Controlled by LH Door Switch (S-40), Time Delay Module (K-20) and Timed Side Work Light Relay (K-34).

ROAD LIGHT SWITCH (S-26) - The side work lights are activated when the key switch is ON, the combine is in field mode, the front work lights are on and the road light switch (S-32) is moved to either the left or right position. Controlled by CCM-1 and Side Work Light Relay (K-35). HEADER HEIGHT - The side lights are activated when the key switch is ON, the combine is in the field operation mode, the front work lights are ON and the header is above the maximum stubble height. Controlled by CCM-1 and the Side Work Light Relay (K-35).

DOOR OPERATION Wiring harness - Electrical schematic frame 38 (A.30.A.88 - C.20.E.38) Wiring harness - Electrical schematic frame 42 (A.30.A.88 - C.20.E.42) The side lights may be controlled by the LH Door Switch (S-40) and the Timed Delay Relay (K-20) whenever the Key Switch (S-02) is in the OFF position. The Timed Delay Relay (K-20) works as follows: Power direct from battery is supplied from fuse F52 to (K-33) relay, then to Time Delay Relay (K-20) pin 87a, then to Dome Light (E-34). Time Delay Relay (K-20) ground path exits pin 85 and travels to the Cab Floor Ground Location #3.

Time Delay Relay (K-20) pin 86 is connected to the LH Door Switch (S-40); note that it does NOT go through the dome light switch, but that the time delay connects to the LH Door Switch in parallel with the dome light assembly. Time Delay Relay (K-20) pin 30 receives Key-ON power from Key Switch (S-02). Time Delay Relay (K-20) pin 87 is output to timed Side Work Light Relay (K-34) pin 1 (frame #44) to energize it. Time delay relay operation is relatively simple. If the Key Switch (S-02) is not ON (no power to pin 30), the Time Delay Relay (K-20) will start its time cycle any time the door switch changes state (either opens OR closes).

When the Door Switch (S-40) changes state (pin 86), the time delay relay activates its output (pin 87) to energize the timed Side Work Light Relay (K-34), which turns on the side lights. The Time Delay Relay (K-20) will power its output (pin 87) for approximately 60 seconds, and then shut off. If the key switch is turned ON during that time cycle, power from the Key Switch (S-02) to pin 30 of the Time Delay Relay (K-20) will interrupt its cycle, and shut the lights off. The Time Delay Relay (K-20) will not cycle based on the Door Switch (S-40) changing state if the key switch (S-02) is turned ON.

ROAD LIGHT SWITCH (S-26) Wiring harness - Electrical schematic frame 36 (A.30.A.88 - C.20.E.36) Wiring harness - Electrical schematic frame 42 (A.30.A.88 - C.20.E.42) When the key switch is in the ON position, the combine is in Field Operation mode, the front work lights are activated, and the road light switch (S-26) is moved to the "left" or "right" position, power from the road light switch (S-26) enters CCM-1 at connector X018 pin J1-2 (left) or pin J1-9 (right). When this happens, CCM-1 sends current from connector X018 pin J1-24 to pin 1 of the side work light relay (K-35). Current enters pin 1 and reaches the coil within the relay.

The ground path exits pin 2 to reach the cab floor ground location #3. This causes the side work light relay to energize and latch pins 3 and 5. The side lights are powered from Fuse F50 through the side work light relay (K-35). HEADER HEIGHT Wiring harness - Electrical schematic frame 42 (A.30.A.88 - C.20.E.42) When the key switch is in the ON position, the combine is in Field operation mode, the front work lights are activated, and the header is above the operator-set maximum stubble height, CCM-1 sends current from connector X018 pin J1-24 to pin 1 of the side work light relay (K-35). Current enters pin 1 and reaches the 9668 1 27/05/2004 A.40.A / 24