DISTRIBUTION SYSTEMS - LIGHTING SYSTEM Side work light Wiring harness - Testing (A.40.A.18.88 - G.40.A.20) AFX8010 9668 1 27/05/2004 A.40.A / 76 N° Test Point Expected Result Other Result (Possible Cause) 1 Place Key Switch S-02 in ON position. Close Work Light Switch S-43. Measure for 12 volts at Side Work Light Relay K-34 (pin 5). 12 volts. If good reading, Go to test 2 Perform Timed Side Work Light Relay Test K-34. 2 Measure for 12 volts at Timed Side Work Light E-25 connector X297 (pin A). 12 volts If good reading, If good reading Go to test 3 Open circuit 76 (PU) between Timed Side Work Lights Relay K-34 (pin 5) and Timed Side Work Light E-25 connector X297 (pin A).
3 Disconnect the Timed Side Work Light E-25. Measure the resistance on circuit 671 (BK) between Timed Side Work Light E-25 connector X297 (pin B) and ground. Less Than1 ohms. If good reading, replace the Timed Side Work Light bulb. Open circuit 671 (BK) between Side Work Light Relay K-34 (pin B) and ground. 4 Place Key Switch S-02 in ON position. Close Work Light Switch S-43. Measure for 12 volts at Side Work Light Relay K-35 (pin 5). 12 volts. If good reading Go to test 5 Perform Side Work Light Relay Test K-35. 5 Measure for 12 volts at RH Side Work Light E-26 connector X298 (pin A).
12 volts If good reading, Go to test 6 Open circuit 72 (PU) between Side Work Lights Relay K-35 (pin 5) and RH Side Work Light connector E-26 X298 (pin A). 6 Disconnect the RH Side Work Light E-26. Measure the resistance on circuit 670 (BK) between RH Side Work Light E-26 connector X298 (pin B) and ground. Less Than 1 ohms If good reading, RH Side Work Light bulb. Open circuit 670 (BK) between Side Work Light Relay K-35 (pin B) and ground.