Chapter Four Lay-up and Fitting Out LAY-UP her is specified. For example, ifmodel3GM is called out in a procedure, the procedure also applies to 3GMD and 3GMF. Boats that are stored for more than a month require careful preparation for the lay-up. This is necessary to prevent the engine from freezing. A thorough service will also minimize damage from corrosion or fuel system con- tamination. Begin the service, if possible, while the boat is still in the water. If the boat has been removed from the water, a supply of cooling water must be made available to the engine. This can be accomplished using a water hose attached to the water pump inlet.
Always start the water flow before starting the engine. 1. Run the engine until it reaches normal operating tem- perature. 2. Change the engine oil and filter as described in Chapter Three. 3. Use a suitable engine fogging oil as instructed by the oil manufacturer. 4. Thoroughly inspect the engine, including the cooling and fuel systems. Perform service work that will protect against damage during extended storage, such as replac- ing hoses and gaskets. Make a list of problems that should be corrected before the boat is returned to service. CAUTION Some of the following steps require water for the cooling system.
The boat must be in the water, or a source of water must be con- nected to the seawater cooling pump. 5. Ifthe engine is equipped with freshwater cooling, flush and change the freshwater coolant as described in Chapter Three. NOTE Except where specified, F and D series en- gines are included when a basic model num- 6. Drain the seawater cooling system as described in this chapter. Be sure to drain or blowout all portions of the system.