Kaiyi HR25/30T-9 — 제목없음

to be carried out by service staff only X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X prior to the operation of new/renewed engines 10 or daily 250 500 1000 in operating hours (max. permissible time) 5.2.4 Deutz Maintenance Schedule prior to the operation of new/renewed engines in ope rating hou rs (max. permissib le time) once a year every other year check clean replace actions to be taken to be carried out by service staff only 10 or daily 250 500 1000 6000 12000 X X X Lubricant fi ll level:

add, if necessary X X Lubricant (Intervals dependent on fi eld of application) X X Oil fi lter cartridge (at each change of lubricants) X X Fuel fi lter cartridge X X Flexible fuel overfl ow conduits X X Flexible fuel overfl ow conduits (replace completely) X X Injection valve X X X Preliminary fuel cleaner X X Preliminary fuel cleaner X X X Coolant (additive concentrate) X X Coolant (additive concentrate) X X Coolant pump X X X X Coolant pump X X X Air intake fi lter (according to maintenance display) X X Air intake fi lter (according to maintenance display) X X X Charge air cooler (drain lubricant/condensed water) X X Charge air cooler (drain lubricant/condensed water) X X Battery and cable connections X X X Engine supervision, warning system X X X Valve play (adjust, if necessary) X X X V-belt (tension or replace, if necessary) X X V-belt (tension or replace, if necessary) X X Pressure retention valve at the injection pump X X X Crank case pressure ventilation valve X X X Crank case pressure ventilation valve X