Komatsu — TIPS FOR LONGER UNDERCARRIAGE LIFE

. OPERATION OPERATION INSPECTION AND REPAIR 2 MEASURING HEIGHT OF GROUSER track shoes, measure height at center of 3 - 112 Frequent i nspection an d prompt repair will reduce repair The f ollowi ng items for i nspection will s erve as a guide to maintenance service of each un dercarriage part. Perform periodical i nspection an limits and r eversing limi MEASURING LINK PITC nsert a wooden blo ck between trac 2. M easu re pitch leng th of 4 links in s tretched portion a t least li p T nks a way for master pin. Of length obtained, 1/4 is the lin s no link window on the master link. lin itch. here i s no link win dow on the mas Basi c link pitch ( P): 154.3 mm (6 Link pitch limit fo r turning:

157 m REMARK The measured value u nder decimal of link pitch is differe nt from the basic value depend measure o r the toleran ce of product ev en if it isn't worn o Don't judg e it's worn ou t too soon, do it with the trend of measured After takin g up slack in shoe as sh own Standar d height (h): Repair li mits: 25 mm