. MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE 7. Open drain valve (7) and drain the water. valve (8). radiator is full, start the 4 - 28 6. Remove covers (4) and (5) at the rear of the machine, pull out drain hose (6), and prepare a REMARK When adding water to the cooling system, keep air bleed valve (8) open. This allows the air to esc When the air is removed and w ape during the filling operation. ater comes out, close air bleed 8. engine and run at low idling t o raise the temperature to at least 90°C (194°F), then con 10 minutes. 9. Stop the engine and open dr 10. 11. Add coolant through the wate r filler port up to the mouth of the port.
For details of the "COOLANT DENSITY TABL E". 12. To bleed the air from the cool ing water, start the engine, run for 5 minutes at low idling, minutes at high idling. (When 13. Drain the coolant inside re serve tank, flush the inside of reserve tank , then add coola marks. nt to between the FULL and LOW 14. Stop the engine and tighten t he cap. Check the coolant level, and add water if the level is l