OPERATION MACHINE OPERATIONS AND CONTROLS 3. Operate bucket control lever (3) and arm control lever (4) slowly to move the bucket cylinder and arm cylinder to the end of the stroke. NOTICE When the work equipment is retracted, take care that it does not interfere with the machine body or ground. 4. Carry out bucket and arm operation for 5 minutes at full stroke, alternating between bucket operation and arm operation at 30 second intervals. 5. After carrying out the warming-up operation, check that each gauge and monitor lamp is in the following condi- tion. Engine water temperature gauge (5) : Inside green range Fuel gauge (6) : Inside green range Engine oil pressure monitor (7) :
OUT Charge level monitor (8) : OUT Electrical system monitor (9) : OUT 6. Check that there is no abnormal exhaust gas color, noise, or vibration. If any abnormality is found, repair it. 7. Set lock lever (2) to the LOCK position and check that it is impossible to operate the swing and work equipment with the left and right work equipment control levers. 8. Set lock lever (2) to the FREE position and inspect the following interference protection action. 3-61