Komatsu — HANDLING 4-SYSTEM

OPERATION MACHINE OPERATIONS AND CONTROLS Stopping during arm IN If the arm is pulled in with the work equipment in the posture in the diagram on the right (maximum right offset), if the bucket enters area A (1000 - 1100 mm (39.4 - 43.3 in)) in the diagram on the right, the arm IN speed will be reduced. This is to pre- vent spillage of soil when the work equipment is stopped. If the work equipment continues to come closer and the bucket enters range B (100 - 200 mm (3.9 - 7.9 in)) in the diagram on the right, the work equipment is automatically stopped.

REMARK When there is automatic stop, operate any of the boom RAISE left offset, or arm OUT to move out of the STOP range, then continue operations. 3-95