Komatsu — INITIAL 250 HOURS MAINTENANCE (ONLY AFTER THE FIRST 250

MAINTENANCE PROCEDURE MAINTENANCE (7) Boom cylinder foot pin (1 point) (8) Offset cylinder foot pin (1 point) (9) Offset cylinder rod end pin (1 point) (10) Sub-link coupling pin (2 points) (11) Second boom-Third bracket coupling pin (2 points) (12) Arm cylinder foot pin (2 points) (13) Arm cylinder rod end pin (1 point) (14) Third bracket-Arm coupling pin (1 point) (15) Bucket cylinder foot pin (1 point) (16) Bucket cylinder rod end pin (1 point) (17) Arm-Link coupling pin (1 point) (18) Link coupling pin (2 points) (19) Bucket-Link coupling pin (2 points) (20) Arm-Bucket coupling pin (1 point) After greasing, raise the boom to the maximum height, then grease the first boom foot pins (2 points) again.

4-44