MAINTENANCE PROCEDURE MAINTENANCE (7) Boom cylinder foot pin (1 point) (8) Offset cylinder foot pin (1 point) (9) Offset cylinder rod end pin (1 point) (10) Sub-link coupling pin (2 points) (11) Second boom-Third bracket coupling pin (2 points) (12) Arm cylinder foot pin (2 points) (13) Arm cylinder rod end pin (1 point) (14) Third bracket-Arm coupling pin (1 point) (15) Bucket cylinder foot pin (1 point) (16) Bucket cylinder rod end pin (1 point) (17) Arm-Link coupling pin (1 point) (18) Link coupling pin (2 points) (19) Bucket-Link coupling pin (2 points) (20) Arm-Bucket coupling pin (1 point) After greasing, raise the boom to the maximum height, then grease the first boom foot pins (2 points) again.
4-44