Komatsu — CHECKING CHARGE PRESSURE OF NITROGEN GAS IN ACCUMULATOR (FOR CONTROL CIRCUIT)

MAINTENANCE MAINTENANCE PROCEDURE 3. Keep the work equipment at the maximum reach, turn the starting switch to the OFF position, and stop the engine. 4. Turn the starting switch to the ON position. 5. Set the lock lever to the FREE position. 6. Operate the work equipment control lever fully to the boom LOWER position. REMARK Check that the area around the machine is safe, then operate the work equipment control lever to the LOWER position. 7. Check that the work equipment goes down to the ground under its own weight. 8. This completes the inspection.

NOTICE If the nitrogen gas charge pressure in the accumulator is low and operations are continued, it will become impossible to release the remaining pressure inside the hydraulic circuit if a failure occurs on the machine. In the following cases, the charge pressure of the accumulator has gone down. Please contact your Komatsu dis- tributor. Work equipment does not go down Stops while going down 4-63