8.2 REMOVAL OF AIR INTAKE MANIFOLD 8.2 REMOVAL OF AIR INTAKE MANIFOLD Remove as follows: 1. Drain the cooling system. 2. Drain the fuel filter module. Refer to section . 3. Remove the poly-V-belts. Refer to section 40.1. 4. Remove the Exhaust Gas Recirculation (EGR) mixer pipe and delivery pipe, refer to section . 5. Remove cold boost pipe. Refer to section 7.2. 6. Remove the fuel filter module. Refer to section . 7. Remove the oil coolant module. Refer to section 26.2 8. Disconnect the high pressure fuel lines connected to the common rail and output side of the high pressure fuel pump. Refer to section . 9.
Disconnect and remove the fuel line connected to the common rail and base of the fuel filter housing. 10. Disconnect and remove the air intake pressure sensor electrical harness connectors from the two air intake sensors. 11. Identify the bolt locations prior to removal of bolts. 12. Remove the thirteen flanged screws and isolator gaskets securing the air intake manifold to cylinder head. 13. Remove the air intake manifold and six gaskets from the cylinder head. Discard gaskets. All information subject to change without notice. 8-6 DDC-SVC-MAN-0081 2010 Copyright © 2010 DETROIT DIESEL CORPORATION