LUBRICATION OF THE HYDRAULIC EXCAVATOR (CONT’D) Figure PM-60 Figure PM-58 11 12 19 13 18 19 P-19385 P-49453 18. X-Change Latch (1) [Figure PM-60] 11. Arm Cylinder Rod End (1) [Figure PM-58] 19. X-Change Pivot Pin (2) [Figure PM-60] 12. Arm Pivot (1) [Figure PM-58] Figure PM-61 13. Bucket Cylinder Base End (1) [Figure PM-58] Figure PM-59 21 17 22 20 15 14 16 P-49454 20. Boom Swing Cylinder Base End (1) [Figure PM-61] P19384 Lubricate the following locations on the hydraulic excavator EVERY 50 HOURS : 14. Bucket Cylinder Rod End (1) [Figure PM-59] 21. Slew Circle (1) [Figure PM-61] 15. Bucket Link Pin (1) [Figure PM-59] 22. Swing Pinion (1) [Figure PM-61] .
(Install 3 to 4 pumps of grease then rotate the upperstructure 90°. Install 3 to 4 pumps of grease and again rotate the upperstructure 90°. Repeat this until the slew pinion has been greased at four positions.) 16. Bucket Pivot (1) [Figure PM-59] 17. Bucket Link (2) [Figure PM-59] 325/328 Excavator Operation and Maintenance Manual 88