DUMP VALVE Adjustment Description Stop the engine. Hydraulic oil from the gear pumps supply the three spool valve. When pressure rises in the valve the dump valve opens and allows oil from one of the gear pumps to flow directly to tank. Figure 20-34-2 Testing Figure 20-34-1 1 2 P-33375 Loosen the lock nut (Item 1) [Figure 20-34-2] . 1 Turn the adjustment screw (Item 2) [Figure 20-34-2] in to increase the pressure or out to decrease the pressure. P-33372 NOTE: One turn is approximately 150 PSI (10 bar). Install a 5000 PSI (345 bar) gauge on the test port (Item 1) [Figure 20-34-1] of the rear gear pump. Tighten the lock nut and retest the dump valve.
Start the excavator and warm the hydraulic oil to operating temperature. WARNING Move the speed control lever to the high speed position. Wear safety glasses to prevent eye injury when any of the following conditions exist: When fluids are under pressure. Flying debris or loose material is present. Engine is running. Tools are being used. Lower the left console. Slowly engage the blade raise circuit. Once the blade is fully raised continue to slowly engage the blade raise circuit. W-2019-1285 The pressure will build to 1595 psi (110 bar) and then drop to zero when the unloading valve opens. Record the pressure.
NOTE:‘ Repeat the above procedure several times to verify when the unloading valve is opening. 442 Excavator 20-34-1 Service Manual