Bobcat Company 442 — Assembly

SWING MOTOR DRIVE CARRIER (CONT’D) Figure 20-91-55 Assembly (Cont’d) Figure 20-91-53 1 1 P-38998 Install the outer nut (Item 1) [Figure 20-91-55] . P-38999 Tighten the nut to 480-550 ft.-lb. (650-750 N•m) torque. Install the washer (Item 1) [Figure 20-91-53] . Figure 20-91-56 Figure 20-91-54 3 2 1 P-40020 Place the washer (Item 1) and snap ring (Item 2) [Figure 20-91-56] on the planetary carrier. Support the carrier in a press. Clamp the carrier shaft with approximately 800 lb. (1085 N•m) of force [Figure 20-91-54] . Apply assembly lube to the bottom of the planetary gear stud (Item 3) [Figure 20-91-56] . 442 Excavator 20-91-16 Service Manual P P -38997