RIGHT CONTROL LEVER (JOYSTICK) Figure 20-110-2 Testing Stop the engine. Open the right side cover. Figure 20-110-1 1 1 2 P-33804 Install a 1000 PSI (69 bar) gauge (Item 1) [Figure 20- 110-2] on the hose. Install a plug (Item 2) [Figure 20-110-2] on the valve section. P-33803 Start the excavator and warm the hydraulic oil to operating temperature. At the 6 spool hydraulic control valve (Item 1) [Figure 20- 110-1] , find the pilot line of the control lever (joystick) that is to be checked (boom, arm or bucket). Engage the circuit to be tested and record the operating pressure. Remove the hose from the control valve. The operating pressure should be approximately 507 PSI (35 bar).
If the operating pressure is correct, check the valve section spool for proper operation. If the operating pressure is incorrect, adjust the pressure reducing valve. (See PRESSURE REDUCING VALVE (S/N 522311001 & ABOVE) on Page 20-33-1 or See PRESSURE REDUCING VALVE (S/N 528911001 & ABOVE AND 528611001 & ABOVE) on Page 20-32-1.) If the operating pressure is still incorrect, repair or replace the pressure reducing valve. 442 Excavator 20-110-1 Service Manual