Bobcat Company 442 — Rubber Track Clearance

TRACKS (CONT’D) Figure 30-20-2 Rubber Track Clearance NOTE: The wear of the pins and bushings on the undercarriage vary with the working conditions and the different types of soil conditions. It is necessary to inspect track tension and maintain the correct tension. (See SERVICE SCHEDULE on Page 10-50-1 for the correct service interval) 1 NOTE: On new excavators or on excavators with new rubber tracks installed, check and adjust as needed the rubber track clearance two to three times on the first day of operation. P-32889 Raise one side of the machine (approximately four inches) using the boom and arm.

Figure 30-20-3 1 P-32888 Raise the blade fully and install jack stands (Item 1) [Figure 30-20-2] & [Figure 30-20-3] under the blade and track frame. Lower the boom until all machine weight is on the jack stands. Stop the engine WARNING AVOID INJURY OR DEATH Keep fingers and hands out of pinch points when checking the track tension. W-2142-0189 442 Excavator 30-20-2 Service Manual