Bobcat Company 442 — Steel Track Clearance

TRACKS (CONT’D) Steel Track Clearance Rubber Track Clearance (Cont’d) NOTE: The wear of the pins and bushings on the undercarriage vary with the working conditions and the different types of soil conditions. It is necessary to inspect track tension and maintain the correct tension. (See SERVICE SCHEDULE on Page 10-50-1 for the correct service interval.). Figure 30-20-4 NOTE: On new excavators or on excavators with new steel tracks installed, check and adjust as needed the steel track clearance two to three times on the first day of operation. Park the excavator on a flat and level surface.

Figure 30-20-6 P-32891 1 0.79 (20 mm) Figure 30-20-5 1 Measure the track sag at the third roller (Item 1) [Figure 30-20-4] from the front of the track frame. Do not get fingers in pinch points between the track and track roller. Use a bolt or dowel of the appropriate size to check the gap between the amount contact edge of the roller and the top edge of the track guide lug [Figure 30-20-5] . MS-1989 Put a straight edge (Item 1) on the top of the track surface between the rear sprocket and the top idler wheel. Measure between the top of the track and the bottom of the straight edge [Figure 30-20-6] . Rubber track clearance 0.787 inches (20 mm). Steel track clearance 0.79 inches (20 mm).

WARNING AVOID INJURY Keep fingers and hands out of pinch points when checking the track tension. W-2142-0189 442 Excavator 30-20-3 Service Manual Track Frame Track Sag 0.787” (20 mm) Track Roller Track B-14067 B-14067