UPPERSTRUCTURE (CONT’D) Swing Bearing Removal And Installation (Cont’d) Figure 40-10-20 1 1 1 P-40252 Support the swing bearing with a jack and remove the bolts (Item 1) [Figure 40-10-20] . Installation: Tighten the bolts to 240 ft.-lb. (325 N•m) torque. Lower the swing bearing away from the upperstructure. Figure 40-10-21 If a new swing bearing is being installed, locate the soft zone area [Figure 40-10-21] . Install the swing bearing so that the soft zone is positioned to the left hand side of the excavator. NOTE: DO NOT locate the soft zone to the front or rear of excavator.
442 Excavator 40-10-7 Service Manual OUT SOF AT T FILL FRONT OF MACHINE ER RACE T ZONE IS HE ER PLUG INNER RACE SOFT ZONE IS IDENTIFIED BY A LETTER S STAMPED ON RING PI-13677A