UPPERSTRUCTURE (CONT’D) Figure 40-10-19 Swing Bearing Removal And Installation 1 1 1 Figure 40-10-17 1 P-40249 Mark and remove three bolts (Item 1) [Figure 40-10-18] & [Figure 40-10-19] from the front and rear of the swing bearing. P-40251 Mark the swing bearing to upperstructure (Item 1) [Figure 40-10-17] . NOTE: The swing bearing is installed with twenty seven bolts that are 70 mm in length and three bolts that are 80 mm in length. Figure 40-10-18 1 1 1 P-40250 442 Excavator 40-10-6 Service Manual