Bobcat Company 442 — Timing Belt Installation

ENGINE COMPONENTS AND TESTING (S/N 528911001 & ABOVE AND S/N 528611001 & ABOVE) (CONT’D) Figure 60-51-77 Timing Belt Installation (Cont'd) Figure 60-51-75 2 N-18865 1 Measure the belt tension. The reading should be 6.5-9.5 [Figure 60-51-77] . N-18852 NOTE: If the specified scale reading is not obtained, repeat the installation procedure starting with [Figure 60-51-63 on Page 22]. Install the belt tension tool (Item 1) [Figure 60-51-75] . NOTE: The belt tension tool may touch the governor linkage cover (Item 2) [Figure 60-51-75], but will not affect the belt tightening procedure. Remove the belt tension tool. NOTE: See Valve Timing before installing the timing belt cover.

(See Valve Timing, Checking on Page 60-51-29) Figure 60-51-76 Figure 60-51-78 1 1 N-18853 Check the position of the belt tension tool (Item 1) [Figure 60-51-76] on the belt. P-58801 Install the belt cover (Item 1) [Figure 60-51-78] and tighten the bolts. 442 Excavator 60-51-25 Service Manual