SECTION 4 OPERATING Page 38 OPERATING TECHNIQUES Fig. 4.42. A Usual Method of Piling A usual method of piling is shown in fig. 4.42. When the piling reaches stages “D” or “E” the operator may elect to continue one of the other depending on height or area desired. When the machine is used as a pusher, aiding scraper loading (Fig. 4.43), the machine power must be carefully controlled. Excessive “push” effort can cause the scraper unit to “jackknife”, with resulting injury or damage. On turns, be sure the blade of the pusher tractor does not come in contact with the rear wheels of the scraper. Fig. 4.43. Aiding Scraper Loading Fig. 4.44.
Loading Directly A bulldozer can be used directly as a loader if the method shown in Fig. 4.44 is used. 4.18.3. BREAKING PILES AND SPREADING Two methods of breaking down a pile are shown in Fig. 4.45. When spreading is to be done in several directions or if the pile is large or hard, Method 1 is usually desired. When using Method 1, cut into the side of the pile from different angles. When Method 2 is used, and access to the top of the pile is difficult, a slot may be started as shown below. Loosen the material at the base and form a dirt “ramp” to provide a decreased angle of approach and cut. TD-15H DRESSTA