OPERATION OPERATION DITCHING WORK Ditching work can be performed efficiently by attaching a bucket to match the width of the ditch and then setting the wheels parallel to the line of the ditch to be excavated. To excavate a wide ditch, first dig out both sides and then finally remove the center portion. LOADING WORK In places where the swing angle is small, work efficiency can be enhanced by locating the dump truck in a place easily visible to the operator. Loading is easier and capacity greater if you begin from the front of the dump truck body than if loading is done from the side.
REPLACEMENT AND INVERSION OF BUCKET When knocking the pin in with a hammer, metal particles may fly and cause serious injury, particularly if they get into your eyes. When carrying out this operation, always wear goggles, helmet, gloves, and other protective equipment. When the bucket is removed, place it in a stable condi- tion. Stop the machine on a firm, flat surface. When performing joint work, make clear signals to each other and work carefully for safety’s sake. REPLACEMENT 1. Place the bucket in contact with a flat surface. REMARK When removing the pins, place the bucket so that it is in light contact with the ground. 136 WARNING Bucket cylinder Link Ar AM090950A m