OPERATION OPERATION If the bucket is lowered strongly to the ground, the resistance will be increased and it will be difficult to remove the pins. 2. Remove the stopper bolts and nuts, then remove pins (A) and (B) and remove the bucket. NOTICE After removing the pins, make sure that they do not become contaminated with sand or mud and that the seals of bushing on both sides do not become damaged. 3. Align the arm with holes (1) and the link with holes (2), then coat with grease and install pins (A) and (B). REMARK When installing the bucket, the O-rings are easily damaged, so fit the O-rings on the boss of the arm end as shown in the dia- gram.
When knocking the pin, move the O-ring down to the regular groove. 4. Install the stopper bolts and nuts for each pin, then grease the pin. AM090970A Bucket O-ring Arm INVERSION 1. Place the bucket in contact with a flat surface. REMARK When removing the pins, place the bucket so that it is in light contact with the ground. If the bucket is lowered strongly to the ground, the resistance will be increased and it will be difficult to remove the pins. 2. Remove the stopper bolts and nuts, then remove pins and, and remove the bucket. AM090980A 137 Bucket cylinder Link Arm AM090950A