. OPERATION MACHINE OPERATIONS AND CONTROLS OPERATION MACHINE OPERATIONS AND CONTROLS lever (2) to the FREE position, and raise the bucket problem is found, contact your Komatsu 3 - 74 2. from th 3. Opera te bucket co ntrol lever (3) and a rm control lever (4) slowly to move the b ucket cylinder and ar m cylinder t o the end of the stroke. 4. Opera te the bucket f or 30 seconds and th e arm f or 30 seconds in turn fully for 5 min utes. NOTICE When the w ork equipment is retracted , tak e care t hat it does no t interfere with the ma chine body or g round. 5.
After carrying out the warming-up op eration machi ne monitor (5) is in the f ollowing co ndition Eng Fue Eng ine coolant te l gauge (7): In ine coolant te mperature side gree mperature gauge (6) n range monitor (8 Eng Cha Fue Pre- ine oil pressu rge level mon l level monito heating moni re monitor itor (10): O r (11): OU tor (12): O Disp lay (13): OU 6. Check for abnorma distrib 7. Move l ock lever (2) t o the LOC K position a nd confirm t hat none of the operations for the contro l levers, w ork equipme nt, blade (if a bl ade is installe d), swing a nd travel c an be made If any