. OPERATION TRANSPORTATION LIFTING MACHINE WARNING NOTICE actually installed on the machine. For the proper lifting to the LOCK position to lock the 3 - 110 The operator carrying out t he lifting operation using a crane must be a properly qualified crane oper Never raise the machine wi Always make sure that the wire rope is of ample strength for t he weight of When lifting, keep the mach When carrying out lifting op erations, set the lock lever to the LO CK position t o prevent the machine fro m moving unexpectedly. Never go in the area under or around the machine when it is r aised. the proper lifting equipment to lift the machine. There is a hazard that the m achine may lose its balance.
Always use the posture giv en in the procedure below and use the proper li fting equipment to lift the The lifting procedure applies t o machines with standard specific The method of lifting differs procedures, contact your Kom For details of the weight, s ee "SPECIFICATIONS (PAGE When lifting the machine, c arry out the operation on flat g round as 1. With a machine of blade specifications, turn the upper structure so that the work equipment will be on the side of sprocket (1). 2. Extend the bucket cylinder and arm cylinder fully, then lower the work equipment to the ground as shown in the diagram on the right using the boom cylinder. 3. Lower the blade to the ground.
(Only machines with blade specification) 1. With a machine of blade specifications, turn the upper s tructure so that the work equip ment will be on the side of spro cket (1). 2. Extend the bucket cyli nder and arm cylinder fully, the n lower the work equipment to t he ground as shown in the dia gram on the right using the boo 3. 4. work equipment contro 5. Stop the engine, check that there is nothing around th e operator's compartment, then ge Close the cab door and front glass securely.