. OPERATION TRANSPORTATION OPERATION TRANSPORTATION 3 - 111 6. Pas s wire ropes between t he 1st and 2nd track rollers from the front and between t he 1st an d 2nd track r ollers from the rear. 7. Put block s between the wire r ope and the machine t o prevent damage t o th e rope or machine. 8. Set t he lif ting angle (A) of the wire rope t o 30 ° to 40° the machine s lowly 9. Afte r the machine come he the hook condition and the lif ting posture, and then lift slowly.