. MAINTENANCE MAINTENANCE PROCEDURE loose, they will the right. contact 4 - 24 CHECK AND TIGHTEN TRACK SHOE BOLTS I f th e m achine is used with track shoe bolts break, s o tighten a ny loose b olts i mmediately Tightening 1. 2. 1. First tighten to a tightenin g torque of 196 ± 19.6 N·m (2 0 ± 2 kgf· m, 144.7 ± 14.5 lbft) then ch eck that the nut and shoe ar e in clo se contact with the link contact s urfac 2. Afte r checking , tighten th e angle of the further shoes) and 60 ° ± 10 ° for road liners 9 0° Order for Tightenin Tighten the bolts i n the orde Afte r tightening, c heck t hat t with the link matin in the diagra t and shoe close