. MAINTENANCE MAINTENANCE PROCEDURE ADJUST BUCKET CLEARANCE WARNING 4 - 32 It is dangerous if the w ork equipment moves by mistake while the bucket clearance is being adju Set t he work equipment on the ground in a stable conditi on, then stop the engine and lock the loc 1. Set the work equi pmentin the position shown in the diagramon the right, then st op the engine and set the lock lever to the ). of the linkage and measure the amount of easier of you move the bucket to one side LOCK position (L 2. Shift O-ring (1) clearance "a". Measurement is (right side of the diagram) or the other so all th e clearance can be measured in one place.
earance) gauge for easy and accurate ounting bolts (2), and loosen plate (3). lit type, so the operation can be carried out the bolts. Use a gap (cl measurement. 3. Loosen 4 plate m ounting bolts (2), and loosen The shim is a sp without removing 4. Remove shim (4) correspondingto the amount of clearance "a" measured above [Example] . earance of 3 mm (0.118 in), remove two 1.0 In the case of cl mm (0.039 in) s hims and one 0.5 mm (0.020 in) shim. Play becomes 0.5 mm (0.020 in). For shim (4), two t ypes of 1.0 mm (0.039 in) and 0. 5 mm (0.020 in)are used. a is smaller than one shim, do not carry out . bolts (2). When clearance any maintenance 5.
Tighten the four If the bolts (2) are too stiff to tighten, pull out pin stopper bolt (5) for easier tighten ing.