Komatsu — LUBRICATING

. MAINTENANCE MAINTENANCE PROCEDURE LUBRICATING 4 - 51 EVERY 500 HOURS MAINTENANCE Maintenance for every 50 , 100 and 250 hour s service s hould be c arried out at the same t NOTICE I f any a bnormal noise is g enerated from any gr easing poin t, carry out g reasing regardless of the Carry o ut greasing every 1 0 hours for the first 5 0 hours on a new machine. grease the wet pins. After th e machine was sub jected to jobs in the water, be su re to grease 1. osture right, lower the work equipm ent to the ground, then stop t he engine. 2. Using a g rease pum rease fitting s shown by arro 3.

After greasing, wipe o ff any old grease th at was pu shed (1) Boom cylinder foot pin (2) Boom foot pin (2 place (3) Boom cylinder rod end pin (2 place (4) Arm c ylinder foot pin ( (5) Boom-Arm coupling pi (6) Arm c ylinder rod end p (7) Bucke t cylinder foot pi