. MAINTENANCE MAINTENANCE PROCEDURE WARNING in the control circuit. Even work equipment to go down CHECKING FUNCTION OF ACCUMULATOR the maximum reach (arm fully dumped) and hold the work 4 - 64 CHECKING CHARGE PRESSURE OF NITROGEN GAS IN ACCUMULATOR (FOR C CIRCUIT) The ac cumulator is charged with high- pressure nitrogen gas, so mistaken operation may cause an explo sion, which will lead to seriou s injury or damage. When handli ng the accumulator, always do as fo llows. The pressure in the hydraulic circui t cannot be completely removed. W hen removing the hydraulic e quipment, do not stand in t the he direction that the oil spurts o ut when carrying out the operation.
I n addition, loosen the bolts sl owly when carrying out operation. r. e of it in fire. ny impact. Do not disassemble the accumulato Do not bring it near flame or dispos Do not make holes in it or weld it. Do not hit it, roll it, or subject it to a Wh en disposing of the accumulato r, the gas must be released. Please contact your Komatsu distrib utor to have this work car ried out. FUNCTION OF ACCUMULATOR The a ccumulator stores the press after t he engine is stopped, the co the fo llowing actions are possible. If t he control lever is operated i eq un uipment, it is possible for th der its own weight. Th e pressure in the hydraulic c The a ccumulator is installed to the on th e right.
Repla ce the accumulator every 2 Chec k the nitrogen gas charge pre 1. S 2. S e e 1. S top the machine on firm, leve 2. S et the work equipment to t xtended and bucket fully quipment at a position 1.5 m NOTIC E out the following procedure to lower the work equipment to the ground within 15 seconds of stopping the engine. Carry out the following procedure to lo wer the work equipment to the grou nd within 15 seconds of stopp When the engine stops, the pressure in the accumulator gradually goes dow n, so inspection can only be c arried out immediately after t he engine is stopped.