Komatsu — CHECKING CHARGE PRESSURE OF NITROGEN GAS IN ACCUMULATOR (FOR CONTROL CIRCUIT)

. MAINTENANCE MAINTENANCE PROCEDURE fully to the boom work equipment control lever to the LOWER position. pressure of the accumulator has gone down. Please contact your Komatsu 4 - 65 3. K equipment maxim ch rn the arting switch to th e OFF p osition, and sto p the engin 4. T urn the starting switch to t he ON p osition 5. S et the lock leve r to the FR EE position. 6. O perate the wo rk equipment control leve . quipme L OWER position REMA RK Chec k that t he area around the machin e is saf e, the n operate the 7. C heck t hat t he w ork equipm ent goe s down to the ground under s own weight. 8.

T his completes t he i nspecti NOTIC E If the n itrogen gas charge p ressure in the ac cumulat or is lo w and operations a re continued, it will beco me impossible to release the re maining pressure inside the h ydraulic circuit i f a failu re occurs on the m achine. I n the following distributor. W ork equipment doe s not g St ops while goin g down